OVADA: Installation

After building a shelf with the help of 3D technician Derek, I help to arrange the installation of it at the OVADA space. All of the Fine Art student that had been selected for the exhibition helped each other to display our work, as an exhibition is a joint project so it was important to help everyone with what needed to be done.

Ryan gave us guidance on how to install our pieces, and he helped me to drill into my shelf backing so that my paper cut stairs would cover the screws, making it look neater.

20170208_152351 (1)

A couple of us helped to make it straight on the wall using a spirit level, and then we held it in place while Ryan drilled screws through pre-drilled holes.

As OVADA is quite moist, I haven’t installed my paper on the shelf yet. I plan on doing this the morning of the preview.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s